Finishings on the interior are quickly coming together, and inspections of completed suites on our Memory Care and Assisted Living floors are in progress! Inspected suites are clean and ready for move in! The kitchen in our Club area has been installed and flooring installation is in progress. Wallpaper is being installed in key areas, and cabinetry in our common areas is set. Lighting and ceilings in many common areas have been completed as well.

Wallpaper in the corridors

 

Wallpaper in the Wellness Centre

 

Suites are inspected and cleaned and ready for move in.

 

Club flooring

 

Hallway Ceiling Lights

 

Our beautiful lights in the Kitchen

 

Week of November 18, 2022

Site activities continue as we have been lucky with favourable weather temperatures and exterior building elements continue to be installed.  The exterior curtain wall and balconies are now complete! Most interior suites on the second, third and fourth floors have been completed and await cleaning and inspection!

 

 

Memory Care: Kitchen

 
Memory Care: Studio

Memory Care: Bathroom

 

Memory Care: Vanity

 

 

Week of November 04, 2022

Site activities continue to be fast paced and our hard work continues as the cold weather sets in.

The exterior cladding continues to be our highest priority and each day that passes brings us closer to the grand reveal. Specially coated balcony railings are now installed and are ready to have their protective covers removed when the time comes.  The concrete sidewalks were completed just before the winter weather hit and we continue to work on interior suite finishes and new light fixtures, leaving many suites ready for final touches.

The Riverwalk construction team has been moving quickly to beat the snow.  The exterior building cladding and concrete hardscapes have continued to be installed. The Riverwalk building has reached a significant milestone with the startup of the heating system! This was a very exciting event for the team.

In the upcoming weeks, we will be focusing on completion of the common areas and the main floor through to the 6th floor. The commercial kitchen is well on its way in the process of completion. This area will be the source of many highlights at Riverwalk and the culinary team. Our concrete sidewalks will be completed this week. Trees and topsoil will also be installed, just making it in time for change in weather.

The interior finishes inside the building have been moving along and are starting to take shape. The in-suite millwork and light fixtures are being installed on the lower floors, along with light fixtures and solid surface counters with ceramic tile backsplash. Watch for our next construction update next month.

Upcoming

  • The Material Hoist will be operating along the South side of the property (25th Ave. SW)
  • The site team will continue the exterior framing, window frame install and cladding. Swing Stages will be operating on all sides of the structure.
  • During the month of June, the North curb lane along 25th Ave. will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.
  • We will have eleven (11) crews on site during the month of June.

 

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of building materials.
    • Mobile equipment will be used to offload some delivery vehicles.
  • Deliveries will take place in the loading zone of 25th Ave. SW.
  • All work will be completed during The City of Calgary Bylaws as per our permit (Monday-Saturday 7am – 10pm).
    • Work June continue outside the normal working hours. However, all work will be completed in accordance with the City of Calgary’s Noise Exemption Permits.
  • When needed, we have trained traffic controllers on our site in order to guide our trucks and local traffic safely and efficiently.
  • Please watch for construction vehicles, workers, and detour signs.

 

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th Ave. SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.
  • Signage, barriers, fencing, pylons and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.
  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.
  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Thank you for your continued patience and cooperation.

Upcoming

  • The Material Hoist will be operating along the South side of the property (25th Avenue SW)
  • The site team will continue the exterior framing, window frame install and cladding. Swing stages will be operating on all sides of the structure.
  • During the month of May, the North curb lane along 25th Avenue will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.
  • We will have Ten crews on site during the month of May.

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of building materials. Mobile equipment will be used to offload some delivery vehicles.
  • Deliveries will take place in the loading zone of 25th Avenue SW.
  • All work will be completed during The City of Calgary Bylaws as per our permit (Monday-Saturday 7am – 10pm). Work may continue outside the normal working hours. However, all work will be completed in accordance with the City of Calgary’s Noise Exemption Permits.
  • When needed, we have trained traffic controllers on our site to guide our trucks and local traffic safely and efficiently.
  • Please watch for construction vehicles, workers, and detour signs.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th Avenue SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.
  • Signage, barriers, fencing, pylons and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.
  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.

Thank you for your continued patience and cooperation.

Presentation Centre

The Riverwalk Retirement Residence Presentation Centre located at the corner of 4th Street SW and 25th Avenue SW (2424 4th Street SW) is now open. Call for your appointment or drop by Monday to Friday. Weekend appointments are available.

Please contact Community Relations Manager, Brent Piercy by phone at (403) 271-7244 or by email at crm1.rw@verveseniorliving.com.

Upcoming

  • The Material Hoist will be operating along the South side of the property (25th Avenue SW).
  • The site team will continue the exterior framing, window frame installs and cladding. Swing Stages will be operating on all sides of the structure.
  • During the month of March, the North curb lane along 25th Avenue will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.
  • We will have ten crews on site during the month of March.

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of building materials.
    • Mobile equipment will be used to offload some delivery vehicles.
  • Deliveries will take place in the loading zone of 25th Avenue SW.
  • All work will be completed during The City of Calgary Bylaws as per our permit (Monday-Saturday 7am – 10pm).
    • Work may continue outside the normal working hours. However, all work will be completed in accordance with the City of Calgary’s Noise Exemption Permits.
  • When needed, we have trained traffic controllers on our site in order to guide our trucks and local traffic safely and efficiently.
  • Please watch for construction vehicles, workers, and detour signs.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th Avenue SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.
  • Signage, barriers, fencing, pylons and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.
  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.
  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Upcoming

  • During the Month of October our site will be pouring our Level 12 Suspended Slab and the Roof, completing the building structure.

  • Concrete trucks will be onsite most days as the team continues their concrete pours.

  • The site team will begin operating the Material Hoist along the South side to aid with the delivery process.

  • The site team will continue the exterior framing, framing, and cladding.

  • The site team will continue installing the building exterior and windows.

  • During the month of October the North curb lane along 25th Ave will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.

  • The Riverwalk site will be open during Labour Day (October 6th), however only essential personnel will be present.

  • We will have Nine crews on site during the month of October.

Sales Centre

  • Work in the new Sales Centre will continue through the month of October.

  • A crew will be onsite every day in order to complete the work in a safe and efficient manner.

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of materials, rebar deliveries, and concrete pours.

  • Deliveries will take place in the loading zone of 25th Ave SW.

  • All work will be completed during The City of Calgary Bylaws as per our permit (Monday-Saturday 7am – 10pm).

  • When needed, we have trained traffic controllers on our site in order to guide our trucks and local traffic safely and efficiently.

  • Please watch for construction vehicles, workers, and detour signs.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th AV SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.

  • Signage, barriers, fencing, pylons, and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.

  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.

  • The crane on site operates within the property lines of our site and is used to assist with deliveries taking place on 25th Ave SW. The crane does not swing an active load over neighbouring properties.

  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Thank you for your continued patience and cooperation.

Dear Neighbours –

Thank you for your interest in the Riverwalk Retirement Residence. We are sending this update to keep you apprised of its progress and how the construction may affect you.

Upcoming

  • During the Month of September our site will be pouring our Level 10 slab and verticals, as well as our level 11 Slab

  • Concrete trucks will be onsite most days as the team continues their concrete pours.

  • The site team will begin operating the Material Hoist along the South side to aid with the delivery process.

  • The site team will continue the exterior framing, framing, and cladding.

  • The site team will begin installing the building exterior and windows.

  • During the month of September, the North curb lane along 25th Ave will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.

  • The Riverwalk site will be open during Labour Day (September 6th), however only essential personnel will be present.

  • We will have nine crews on site during the month of September.

Sales Centre

  • Work in the new Sales Centre will continue through the month of September.

  • A crew will be onsite every day to complete the work in a safe and efficient manner.

  • The garbage bin on 25th AV will be removed early September.

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of materials, rebar deliveries, and concrete pours.

  • When needed, we have trained traffic controllers on our site in order to guide our trucks and local traffic safely and efficiently.

  • Please watch for construction vehicles, workers, and detour signs.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th AV SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.

  • Signage, barriers, fencing, pylons and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.

  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.

  • The crane on site operates within the property lines of our site and is used to assist with deliveries taking place on 25th Ave SW. The crane does not swing an active load over neighbouring properties.

  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Thank you for your continued patience and cooperation.

August Update – Riverwalk Retirement Residence.

Construction is moving along and the following will be happening at the site.

  • The site team will begin the exterior framing, framing and cladding.

  • During the month of August the North curb lane along 25th Ave will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.

  • The Riverwalk site will be open during Heritage Day (August 2nd), however only essential personnel will be present.

Sales Centre

  • Work in the new Sales Centre has begun and will continue through the months of August and September.

  • A small crew will be onsite every day to complete the work in a safe and efficient manner.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th AV SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.

  • Signage, barriers, fencing, pylons, and traffic control personnel are all utilized on the site to ensure the safety of pedestrians and motorists.

  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.

  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Thank you for your continued patience and cooperation.