Riverwalk Construction Update

  • The building structure is complete! During the month of November, the site team will be completed small miscellaneous concrete pours.

  • Concrete trucks will be onsite most days as the team continues their concrete pours.

  • Reinforcing steel will be delivered to the site throughout the month. Deliveries occur in the loading zone on 25th Ave SW.

  • The site team will continue the exterior framing, window frame install and cladding.

  • The site team will continue installing the building exterior and windows.

  • During the month of November the North curb lane along 25th Ave will be closed to accommodate deliveries and concrete. Traffic will still be open for both East and West bound vehicles.

  • The Riverwalk site will be open on Remembrance Day (November 11th), however only essential personnel will be present. A moment of silence will be observed on site.

  • We will have Nine crews on site during the month of November.

Presentation Centre

  • Work in the new Presentation Centre will continue through the month of November.

  • A crew will be onsite every day in order to complete the work in a safe and efficient manner.

Traffic/Noise

  • There will be various trucks onsite Monday to Saturday for delivery of materials, rebar deliveries, and concrete pours.

  • Deliveries will take place in the loading zone of 25th Ave SW.

  • All work will be completed during The City of Calgary Bylaws as per our permit (Monday-Saturday 7am – 10pm).

  • Work may continue outside the normal working hours. However, all work will be completed in accordance with the City of Calgary’s Noise Exemption Permits.

  • When needed, we have trained traffic controllers on our site in order to guide our trucks and local traffic safely and efficiently.

  • Please watch for construction vehicles, workers, and detour signs.

Site Safety Measures

  • For the safety of the community, the adjacent sidewalk along 25th AV SW will be closed for the foreseeable future. Please use the southern sidewalk by Safeway for safe access.

  • Please obey any signs or traffic control personnel when near this site. They are all there for your safety.

  • The crane on site operates within the property lines of our site and is used to assist with deliveries taking place on 25th Ave SW. The crane does not swing an active load over neighbouring properties.

  • This construction site will remain open during the COVID-19 pandemic as we are deemed an essential service by the provincial government. We continue to stay informed with up-to-date information, follow all guidelines and meet all standards put in place by the Province of Alberta to ensure we are doing our part in keeping everyone safe.

Thank you for your continued patience and cooperation.